The Challenge
The largest challenge was the tight schedule to get this school built and opened. The previous school caught fire and was a total loss, so this school had to be built so students could return in a timely manner.
Our Solution
Working closely with the general contractor, keeping the information flowing and the line of communication opened is what really assisted us with providing casework and other manufactured goods to the site prior to the opening of the new school.
The Results
The result was that the school was opened and students were allowed to return to a new school in a familiar location with everything in its place.